0.00 ft.Proven, sealed, defended.

Engineering analysis and sealed certification that proposed development in a regulatory floodway won’t raise the base flood elevation.

Reply within one business dayPE-sealed deliverablesTexas · Florida
STA 0+00What it means

What “no rise”actually means.

Zero means zero, reported to the hundredth of a foot.

When development is proposed in a regulatory floodway, federal floodplain rules require an engineering analysis showing the project won’t increase flood heights during the base flood (44 CFR 60.3(d)(3)). In practice that means showing 0.00 ft of rise at every cross-section.

“Development” is broad. Under the federal definition it includes buildings, fill, grading, paving, excavation and storage of materials, not just structures.

STA 0+00How it’s done

Four models.One comparison.

01Duplicate effective

Reproduce FEMA’s effective model and its published results.

02Corrected effective

Fix errors and add detail, without the project.

03Existing conditions

Model the site as it is today.

04Proposed conditions

Add the project and compare every cross-section to the hundredth of a foot.

STA 0+00Try it

Fill the floodway.Watch the water answer.

Push fill into the floodway, then add a compensating cut that restores the lost conveyance.

Illustrative section · not a modelNo-rise standard 0.00 ft
0 ft
Meets no-rise
Rise in base flood elevation0.00 ft
Standard in the floodway0.00 ft
Cross-sections checkedEvery one
A real no-rise analysis compares existing and proposed HEC-RAS models at every cross-section. This drawing teaches the idea.
STA 0+00The deliverable

The comparison,cross-section by cross-section.

StationExisting WSEL (ft)Proposed WSEL (ft)Change (ft)
10+0023.4123.410.00
11+5023.8823.880.00
12+4024.1224.120.00
13+7524.6724.670.00
15+2025.3025.300.00

Example output format. Values are illustrative.

STA 0+00Questions

Straightanswers.

What if the model shows a rise?

Then the project changes, with less fill or a compensating cut that restores conveyance, or it goes through a CLOMR before it can be permitted.

Who signs the certification?

A licensed professional engineer, with the supporting analysis attached.

Is no-rise the same as compensating storage?

No. No-rise is about flood heights in the floodway. Compensating storage is a local or state requirement in some places to replace flood storage lost to fill. Some projects need both.

Does a fence or a small shed need one?

If it’s development in a regulatory floodway, the community can require it. Ask your floodplain administrator early. We’ll help you read the ordinance.

STA 0+00Start a project

Build in the floodwaywithout raising the water.

Email mcreel@creelengineering.comPhone 919-757-2886Reply within one business day
919-757-2886Start a project →