The work,one sheet at a time.

Every file answers four things: where, what the problem was, how it was modeled and how it ended.

Reply within one business dayPE-sealed deliverablesTexas · Florida
Example layout

No-rise certification

Where
County, state
Problem
Culvert replacement inside a regulatory floodway.
Method
HEC-RAS 1D, existing vs proposed.
Outcome
One line on how it ended.
Example layout

Detention for a subdivision

Where
County, state
Problem
New development can’t raise downstream peak flow.
Method
HEC-HMS routing, pond sized to match.
Outcome
One line on how it ended.
Example layout

Street flooding complaint

Where
County, state
Problem
Repeat flooding at one intersection.
Method
Field visit, storm drain capacity analysis.
Outcome
One line on how it ended.
Example layout

Due diligence screening

Where
County, state
Problem
A buyer needed to know how much of a parcel was buildable.
Method
FEMA NFHL review, site survey, floodplain limits.
Outcome
One line on how it ended.
Example layout

CLOMR for a channel improvement

Where
County, state
Problem
A channel change that would move the floodplain boundary.
Method
Duplicate effective, corrected effective, proposed.
Outcome
One line on how it ended.
Example layout

Culvert upsizing

Where
County, state
Problem
An undersized culvert overtopping a road.
Method
HEC-RAS culvert analysis, tailwater check.
Outcome
One line on how it ended.
STA 0+00Start a project

Your projectcould be the next sheet.

Email mcreel@creelengineering.comPhone 919-757-2886Reply within one business day
919-757-2886Start a project →